This prompt has variables that can be replaced with your own
information. Copy and use it with your preferred LLM, or try it
out in the LearnerBox Prompt Playground.
Act as an experienced interior architect specializing in commercial kitchens, food-service planning, and ergonomic workflow.
Develop a preliminary architectural ergonomics and workflow matrix using the information below.
Food-service concept and output:
{{food_service_context}}
Menu, production, and service model:
{{menu_service_model}}
Space, layout, and existing conditions:
{{space_conditions}}
Equipment and utility requirements:
{{equipment_utilities}}
Staffing, deliveries, and operating patterns:
{{operations}}
Codes, hygiene, budget, and project constraints:
{{codes_constraints}}
Planning requirements:
1. Map all primary workflows:
- receiving;
- inspection;
- dry storage;
- refrigerated storage;
- frozen storage;
- thawing;
- washing;
- raw preparation;
- allergen-controlled preparation;
- cooking;
- baking;
- cooling;
- holding;
- plating;
- service;
- returns;
- dishwashing;
- pot washing;
- waste;
- recycling;
- cleaning;
- staff changing; and
- emergency response.
2. Identify where clean, dirty, raw, cooked, allergen, staff, customer, delivery, and waste flows should be separated.
3. Create a zone adjacency matrix for:
- receiving;
- stores;
- prep;
- cookline;
- pass;
- service;
- wash-up;
- waste;
- staff;
- office;
- plant; and
- external access.
4. Develop at least three workflow concepts:
- linear;
- island;
- zone-based;
- or another supplied model.
5. Evaluate each concept for:
- travel distance;
- cross-traffic;
- supervision;
- speed;
- safety;
- hygiene;
- accessibility;
- staffing;
- peak capacity;
- flexibility;
- cleaning;
- maintenance;
- utility distribution; and
- future menu change.
6. Review ergonomic factors including:
- work-surface heights;
- reach;
- lifting;
- bending;
- turning;
- aisle width;
- passing;
- anti-fatigue;
- visibility;
- burns;
- cuts;
- slips;
- manual handling;
- heat;
- noise; and
- repetitive tasks.
7. Develop an equipment schedule with:
- footprint;
- door swing;
- service clearance;
- maintenance access;
- utility connections;
- ventilation;
- heat rejection;
- drainage;
- cleaning;
- anchorage;
- delivery route; and
- replacement route.
8. Coordinate:
- exhaust;
- make-up air;
- grease;
- gas;
- electrical;
- water;
- hot water;
- drainage;
- floor wastes;
- refrigeration;
- fire suppression;
- lighting;
- acoustics;
- waterproofing;
- wall protection; and
- ceilings.
9. Include food-safety and allergen-management planning principles without inventing regulatory requirements.
10. Review delivery, stock rotation, waste storage, pest control, and cleaning logistics.
11. Include peak-period, reduced-staffing, equipment-failure, and emergency operating scenarios.
12. Do not invent production volumes, equipment capacities, health regulations, utility loads, fire requirements, or hygiene certification.
13. Do not certify food safety, ergonomics, ventilation, fire, accessibility, or code compliance.
14. Flag all items requiring food-service consultant, chef, operator, architect, MEP, fire, refrigeration, occupational-health, accessibility, hygiene authority, contractor, and equipment supplier review.
Present the result as:
{{output_format}}
Include:
- process-flow map;
- clean and dirty flow separation;
- adjacency matrix;
- three workflow concepts;
- option comparison;
- ergonomic risk review;
- equipment and clearance schedule;
- utility and ventilation coordination;
- hygiene and allergen controls;
- delivery and waste strategy;
- operating scenarios;
- risk register; and
- professional validation checklist.