This prompt has variables that can be replaced with your own
information. Copy and use it with your preferred LLM, or try it
out in the LearnerBox Prompt Playground.
Act as an experienced interior architect and architectural lighting-design coordinator.
Develop a preliminary custom lighting placement and photometric planning brief using the information below.
Project type and spatial program:
{{project_context}}
Room geometry, surfaces, and ceiling conditions:
{{room_conditions}}
Tasks, users, and experiential goals:
{{lighting_goals}}
Daylight and façade conditions:
{{daylight_conditions}}
Proposed luminaires, controls, and electrical systems:
{{lighting_systems}}
Codes, energy, budget, maintenance, and project constraints:
{{project_constraints}}
Planning requirements:
1. Define lighting objectives for:
- visual performance;
- ambience;
- orientation;
- hierarchy;
- identity;
- comfort;
- accessibility;
- safety;
- flexibility;
- energy;
- maintenance; and
- integration with daylight.
2. Classify spaces and tasks by:
- ambient lighting;
- task lighting;
- accent lighting;
- decorative lighting;
- vertical illumination;
- display;
- circulation;
- emergency interface;
- exterior transition; and
- night use.
3. Develop a room-by-room lighting schedule covering:
- task;
- target illuminance range to be verified;
- uniformity;
- vertical light;
- glare risk;
- color temperature;
- color rendering;
- beam distribution;
- fixture type;
- mounting;
- spacing logic;
- controls;
- emergency interaction;
- maintenance; and
- commissioning.
4. Create at least three lighting concepts:
- discreet integrated architectural lighting;
- layered hospitality-style lighting;
- expressive decorative and feature lighting.
5. Compare concepts for visual comfort, flexibility, ceiling integration, controls, energy, maintenance, cost, accessibility, and atmosphere.
6. Coordinate luminaire placement with:
- ceiling grids;
- structure;
- sprinklers;
- smoke detectors;
- diffusers;
- speakers;
- cameras;
- signage;
- curtains;
- partitions;
- joinery;
- artwork;
- furniture;
- AV;
- doors;
- access panels; and
- maintenance routes.
7. Review glare for seated, standing, screen-based, reflective, display, hospitality, and circulation conditions.
8. Review daylight interaction, dimming, blinds, solar exposure, and changing seasonal conditions.
9. Develop control scenes for normal, presentation, cleaning, after-hours, event, emergency, and maintenance modes.
10. Include accessibility considerations involving contrast, adaptation, flicker, orientation, control usability, and visual sensitivity.
11. Identify required photometric calculations, renderings, samples, mockups, product data, and on-site aiming.
12. Include energy, heat, driver access, replacement, lamp or module life, and spare strategy.
13. Do not invent photometric results, illuminance, glare values, product performance, energy use, emergency-lighting compliance, or code requirements.
14. Do not certify lighting, electrical, emergency, accessibility, energy, or code compliance.
15. Flag all items requiring lighting designer, electrical engineer, architect, interiors, fire, AV, controls, façade, accessibility, energy, contractor, and manufacturer review.
Present the result as:
{{output_format}}
Include:
- lighting objectives;
- room and task matrix;
- three lighting concepts;
- concept comparison;
- preliminary fixture-placement logic;
- glare and daylight review;
- ceiling coordination checklist;
- control-scene schedule;
- accessibility considerations;
- photometric and mockup requirements;
- maintenance and commissioning plan;
- risk register; and
- professional validation checklist.