This prompt has variables that can be replaced with your own
information. Copy and use it with your preferred LLM, or try it
out in the LearnerBox Prompt Playground.
Act as an experienced commercial and mixed-use architect specializing in podium buildings, vertical circulation, and operational separation.
Develop a preliminary retail-to-residential circulation strategy using the information below.
Project location and planning context:
{{project_location}}
Site, podium, and tower configuration:
{{building_configuration}}
Retail and residential program:
{{program_mix}}
Access, parking, and service conditions:
{{access_service}}
Security, operations, and user profiles:
{{operations_users}}
Codes, fire, accessibility, and project constraints:
{{codes_constraints}}
Planning requirements:
1. Identify all user and operational flows:
- residents;
- residential guests;
- retail customers;
- retail staff;
- office or other users where relevant;
- deliveries;
- waste;
- maintenance;
- emergency services;
- vehicles;
- cyclists;
- pedestrians;
- ride-hailing;
- accessible drop-off; and
- after-hours users.
2. Define which circulation systems should be:
- shared;
- separated;
- controlled;
- time-managed; or
- capable of emergency crossover.
3. Develop at least three circulation concepts:
- fully separated cores;
- shared podium with controlled vertical separation;
- hybrid linked-lobby system.
4. For each concept, evaluate:
- wayfinding;
- security;
- privacy;
- retail visibility;
- resident experience;
- vertical transport;
- fire strategy;
- accessibility;
- service efficiency;
- parking connections;
- after-hours operation;
- area efficiency;
- cost;
- management complexity; and
- future tenancy change.
5. Map horizontal and vertical routes from street, parking, loading, transit, and open space to all major destinations.
6. Coordinate:
- public entrances;
- residential lobbies;
- retail entries;
- lift groups;
- escalators;
- stairs;
- service lifts;
- loading docks;
- waste rooms;
- back-of-house corridors;
- parking;
- bicycle facilities;
- mail and parcel rooms;
- amenities;
- podium roof; and
- tower cores.
7. Identify conflict points involving pedestrians, vehicles, deliveries, refuse, service staff, retail queues, and residents.
8. Create an access-control zoning plan for public, semi-public, resident-only, staff-only, service, and restricted areas.
9. Include a day, evening, overnight, event, and emergency operating review.
10. Include accessibility and equitable arrival from all transport modes.
11. Include preliminary vertical-transport demand logic without inventing lift calculations.
12. Do not invent occupancy, lift handling capacity, fire compartments, code requirements, parking ratios, security policy, or tenant operations.
13. Do not certify fire, egress, accessibility, traffic, vertical-transport, or code compliance.
14. Flag all items requiring architect, fire, vertical-transport, traffic, accessibility, security, retail, residential operations, waste, MEP, structural, and authority review.
Present the result as:
{{output_format}}
Include:
- user-flow inventory;
- shared and separated circulation principles;
- three circulation concepts;
- option comparison matrix;
- horizontal and vertical route map;
- access-control zoning;
- loading and service strategy;
- parking and arrival integration;
- conflict-point register;
- operating-mode review;
- wayfinding principles;
- unresolved data; and
- professional validation checklist.