This prompt has variables that can be replaced with your own
information. Copy and use it with your preferred LLM, or try it
out in the LearnerBox Prompt Playground.
Act as an experienced residential architect and interior architect specializing in custom millwork, cabinetry, and integrated spatial planning.
Develop a preliminary millwork integration plan using the information below.
Project rooms and user needs:
{{rooms_user_needs}}
Measured dimensions and fixed elements:
{{dimensions_fixed_elements}}
Storage inventory and equipment:
{{storage_equipment}}
Materials and aesthetic direction:
{{materials_aesthetic}}
Lighting, electrical, and MEP requirements:
{{services_requirements}}
Budget, fabrication, and site constraints:
{{fabrication_constraints}}
Planning requirements:
1. Create a room-by-room millwork brief for all applicable spaces, such as:
- entry;
- living room;
- dining;
- kitchen;
- pantry;
- bedrooms;
- wardrobes;
- study;
- library;
- media room;
- bathrooms;
- laundry;
- mudroom;
- stairs;
- corridors; and
- outdoor storage.
2. Classify storage by:
- item type;
- quantity;
- frequency of use;
- user;
- visibility;
- security;
- environmental sensitivity;
- weight;
- maintenance; and
- future growth.
3. Coordinate millwork with circulation and furniture clearances.
4. Identify pinch points caused by open doors, drawers, pull-outs, appliance doors, seating, and simultaneous users.
5. Develop a preliminary module logic for:
- base units;
- tall units;
- overhead units;
- open shelves;
- display;
- concealed storage;
- integrated seating;
- work surfaces;
- media;
- wardrobes;
- utility storage; and
- adaptable components.
6. Address ergonomic and access considerations, including standing and seated use, reach ranges, visual access, child safety, and aging-in-place adaptability.
7. Coordinate:
- structure;
- wall build-ups;
- tolerances;
- skirtings;
- floors;
- ceilings;
- door casings;
- windows;
- HVAC grilles;
- sprinklers;
- plumbing;
- drainage;
- electrical outlets;
- data;
- lighting;
- speakers;
- appliances;
- ventilation; and
- access panels.
8. Create a lighting strategy for task, display, ambient, wardrobe, toe-kick, and integrated lighting.
9. Review material suitability for moisture, heat, UV exposure, scratching, staining, emissions, fire requirements, cleaning, repair, and replacement.
10. Develop a fabrication and installation sequence, including survey, shop drawings, samples, mockups, service rough-ins, site verification, delivery, installation, adjustment, and handover.
11. Include allowance for movement, ventilation, maintenance access, and future replacement of appliances or equipment.
12. Create a millwork coordination matrix by room and trade.
13. Do not invent dimensions, appliance specifications, structural capacity, product performance, costs, or code requirements.
14. Do not certify structural support, fire performance, accessibility, indoor-air quality, or fabrication adequacy.
15. Flag all items requiring architect, interior architect, structural, MEP, lighting, appliance, fabricator, contractor, and manufacturer review.
Present the result as:
{{output_format}}
Include:
- room-by-room millwork brief;
- storage inventory matrix;
- circulation and conflict review;
- module logic;
- ergonomic and accessibility criteria;
- service coordination matrix;
- lighting strategy;
- material suitability review;
- fabrication and installation sequence;
- maintenance and replacement strategy;
- risk register; and
- professional validation checklist.