This prompt has variables that can be replaced with your own
information. Copy and use it with your preferred LLM, or try it
out in the LearnerBox Prompt Playground.
Act as an experienced architect specializing in adaptive reuse and residential conversion.
Conduct a preliminary feasibility review using the information below.
Project location and planning context:
{{project_location}}
Existing building description:
{{existing_building}}
Survey, structure, and condition information:
{{building_condition}}
Proposed residential program:
{{proposed_program}}
Services, access, and environmental information:
{{services_environment}}
Heritage, budget, schedule, and project constraints:
{{project_constraints}}
Review requirements:
1. Define the proposed change of use and intended residential occupancy.
2. Summarize verified existing-building information and list unknowns.
3. Review preliminary feasibility across planning, title, heritage, structure, floor heights, loading, façade, building depth, daylight, ventilation, fire, escape, compartmentation, accessibility, vertical circulation, parking, refuse, acoustics, thermal performance, moisture, hazardous materials, utilities, drainage, MEP, energy, amenity, construction access, and occupied-building constraints.
4. Identify existing characteristics that support conversion and those creating risk.
5. Evaluate planning efficiency using structural bay, core position, façade-to-core depth, window spacing, unit frontage, corridor length, wet-stack alignment, net-to-gross efficiency, and subdivision flexibility.
6. Develop three scenarios: minimal intervention, moderate reconfiguration, and major transformation or extension.
7. Assess each scenario for likely yield range, intervention level, structure, façade, services, fire, access, heritage, disruption, schedule, cost, and approval risk.
8. Create a due-diligence schedule listing surveys, tests, records, and consultants.
9. Identify fatal flaws, major risks, manageable risks, and value-creation opportunities.
10. Treat unit counts, costs, schedules, and approvals as preliminary.
11. Do not invent planning status, structure, hazardous materials, title, code, measurements, or service capacity.
12. Do not certify suitability, structure, fire, environmental safety, accessibility, compliance, or investment viability.
13. Flag planning, heritage, legal, survey, structural, fire, façade, MEP, civil, environmental, acoustic, energy, accessibility, cost, and building-control reviews.
Present the result as:
{{output_format}}
Include:
- project and change-of-use summary;
- verified information and unknowns;
- opportunity assessment;
- planning and heritage review;
- structural and dimensional review;
- daylight, ventilation, and unit-planning review;
- fire, access, and services review;
- three conversion scenarios;
- risk and opportunity matrix;
- due-diligence schedule;
- preliminary go, revise, or stop criteria; and
- validation checklist.